Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Description

To be updated.

Requirements

The purpose of this area is to provide some example guidelines for those organizations who want to deploy an EdgeX system in a Oil&Gas concern.

Test beds with other parties such as IIC could be included as well.

Requirements

Provide information on the following:

  • Hardware
  • Software
  • Notes

...

Design

Reference CaseSpecific ScenarioHW
Recommended SpecsSW Recommended Specs
specs for EdgeX GatewayEdgeX MicroservicesNotes
& Recommendations
Single AssetSmall Standalone Equipment (Pump, Separator, Manifold, Tank)



Big Standalone Equipment (Gas Compressor, Gas Turbine)



Well Intervention Unit (Frac, Coiled Tubing, Wireline, Process Unit)



Artificial Lift System (PCP, Rod Pump, ESP, Plunger Lift, Gas Lift)


On-Shore FacilityLand Rig



Small Production Facility (up to 1,000 sensor/control inputs)



Medium Production Facility (up to 10,000 sensor/control inputs)



Big Production Facility (up to 100,000 sensor/control inputs)


Off-Shore FacilityOff-Shore Rig



Small Off-Shore Facility (up to 1,000 sensor/control inputs)



Medium Off-Shore Facility (up to 10,000 sensor/control inputs)



Big Off-Shore Facility (up to 100,000 sensor/control inputs)



Code

No additional code is necessary as part of this activity.

...

Waiting for EdgeX 0.5 Docker Compose file to start the tests that will provide the basis to generate recommendations on the reference cases. More representative tests will need to be taken with EdgeX 1.0 Docker Compose file since the California Release will be closer to provide the real performances expected on a EdgeX System.