You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Attendees: Attendees that may have joined after the start of the meeting may not have been captured and listed.


Discussion and action items as a result of meeting in RED


Old Business

  • Start/stop/restart EdgeX micro services – redesign API and executors
    • PRs merged
    • Design doc updated
  • Add CPU usage metrics – merged
    •  We’ll want to look at potential redesign of metrics through something like executors in future releases
  • Add system management API to Go DS SDK
    •  Akram WIP
  • Add system management API to C DS SDK
  • Add system management API to App Services SDK
  • Add health/status check of the services to the SMA
    • This will be a call through to the configuration/registry service (Consul)
    • Allows a single point of entry for all EdgeX control plane needs
  • Long term road map update (see separate doc for this meeting)
    • https://wiki.edgexfoundry.org/download/attachments/329501/EdgeX%20Foundry%20System%20Management%20Roadmap-11-26-18.pdf?version=1&modificationDate=1543285863433&api=v

New Business

  • No labels